SIM PLATFORMYuma Field Pilot
JUL 01–07, 2026RUN 004 ACTIVE
Overview
Operating condition at a glance.
Maintain stable low-flow operation for seven consecutive days.
Pressure envelopePASS
Flow stabilityPASS
Storage reserveWARNING
Sensor completenessINCONCLUSIVE
Measured 38%Calculated 24%Modeled 21%Unverified 17%
Verification engine
Calculated from Run 004Intended state versus observed state.
CRITERIONINTENDEDOBSERVEDRESULT
Line pressure10–15 PSI12.4 PSIPASS
Storage reserve≥30%68%PASS
Soil tension10–25 kPa18 kPaPASS
Sensor completeness7 daily records5 completeINCONCLUSIVE
Evidence Studio
Performance verification report.
SMART IRRIGATION MANAGEMENT
SIM / VR-004Yuma Field Pilot
Performance Verification Report · Run 004
RESULTPASS WITH FOLLOW-UP
PERIOD01–07 JUL 2026
PROTOCOLVERSION 0.4
Operating objective
Maintain stable low-flow operation and root-zone tension for seven consecutive days.
Verification summary
MEASUREOBSERVEDSTATUSEVIDENCE
Line pressure12.4 PSIPASSMEASURED
Reservoir reserve68%PASSMEASURED
Soil tension18 kPaPASSMEASURED
Application rate0.56 GPHREFERENCECALCULATED
Field note
Filter inspected. Two surface emitters showed reduced output; marked for follow-up. No visible pooling.